Skip to content

Project manage the design and construction of an electrical power station for a community of 20,000 residents.

    Topic: Project manage the design and construction of an electrical power station for a community of 20,000 residents.

    Content
    Introduction
    Subject of the essay arranged under sub-headings
    involves definition & description; data & analysis;
    illustrations (images, charts & diagrams); and
    specialised language
    Conclusion
    References

    This project report is on the project appraisal incorporating technical, economical and environmental evaluation of
    Project manage the design and construction of an electrical power station for a community of 20,000 residents.
    Technical (40%)
    Economical (30%)
    Environmental (30%)

    Research Publication (Written)
    Title page, Abstract and Contents
    – complete and representative title
    – concise abstract (what?, why?, how?,
    findings)
    – comprehensive contents page
    Introduction
    – problem identification
    • need for the research, including critical
    analysis of available literature
    – clearly stated objective and aims
    – a summary on report organisation Research Publication (Written) contd.’
    Research Method
    – clearly presented methods for repeatability
    – assumptions and limitations
    – analysis techniques clearly described/identified
    Results
    – tables, figures, photographs and illustrations to
    enhance findings
    – clearly argued findings
    – identify potential for future directions
    References
    – cite all references used in the report using Harvard
    (name-year) style

    resources
    • Smith, K. A.. and Imbrie, P. K. 2007, Teamwork and Project Management, 3rd ed., Mc-Graw Hill, NY, USA
    • Finkelstein, L, 2008 Pocket Book of Technical Writing: for Engineers and Scientists, 3rd ed., Mc-Graw Hill, NY, USA.

    Readings: (ALL texts have been placed on 2-hour RESERVE at Allen
    Library)
    • Burke, R., 2003, Project Management: Planning and Control Techniques, 4th ed., John Wiley & Sons, New York, USA.
    • CCH Editors. 2007. CCH Australian Master OHS and Environmental Guide. 2nd ed. CCH Australia Limited.
    • De Cieri, H., Kramar, R., Noe, R. A., Hollenbeck, J. R., Gerhart, B. And Wright, P. M. 2008, Human Resource Management in Australia. 3rd ed., McGraw-Hill Australia Pty Ltd.
    • Duncan, W. R. 1996. A Guide to Project Management Body of Knowledge. PMI Publishing Division, North Carolina, USA.
    • Grammeno, G. 2009. Planning Occupational Health and Safety. 8th ed. CCH Australia Limited.
    • Finkelstein, L, 2008 Pocket Book of Technical Writing: for Engineers and Scientists, 3rd ed., Mc-Graw Hill, NY, USA.
    • Johnson, L., 1994, Project Management, video recording, CareerTrack Publications, Boulder, CO, USA. (four volumes)
    • Michaels, J. V., 1996, Technical risk management, Prentice Hall, NJ, USA
    • PMI, 2008, A Guide to the Project Management Body of Knowledge, 4th ed., PMI Publishing Division, North Carolina, USA. Quinlan & Bohle, L. 2010. Managing OH and S. Pan Macmillan, Australia.
    • Standards Australia 1997, General Conditions of Contract, AS4000
    • (AS2124) Retrieved June 25, 2007, from Standards Australia Online
    • database. Standards Australia 1997, General Conditions of Contract, AS4000-1997. (AS2124) Available from Standards Australia Online.
    • Standards Australia 2002, Minor Works Contract Conditions (Superintendent administered). AS4905-2002, Retrieved June 25, 2007, from Standards Australia Online database.

    CRAZY OFFER!!! ASSIGNMENTS COMPLETED FOR FREE!!

    GET THIS ASSIGNMENT DONE FOR FREE NOW, JUST PLACE YOUR ORDER AND DO NOT MAKE ANY PAYMENT: WE WILL COMPLETE THE PAPER FIRST BEFORE YOU PAY AND YOU PAY ONLY AFTER YOU RECEIVE AND APPROVE YOUR COMPLETED PAPER! IF YOU ARE NOT IMPRESSED, WE WILL NOT ASK ANYTHING FROM YOU! WHAT ELSE WE WILL DELIVER IT WITHIN YOUR SPECIFIED TIME FROM 3 HOURS TO 10 DAYS DEADLINE.

     

    THIS IS ONLY A LIMITED OFFER! TAKE ADVANTAGE!!